How did electric vehicles change the structure of the auto industry?

A car is one part of a larger mobility solution. Drivers also need a dependable way to refuel or recharge. With electric cars, carmakers began competing on where their customers could charge. 1

Five layers of the electromobility industry, showing batteries, vehicles, charging, the power grid and the mobility market. Begin The inherited industry

THE INHERITED INDUSTRY

The trips a car has to serve

We start with the trip and the shift from filling up to plugging in. Then we look inside the car at who designs it, who supplies its batteries and who is accountable for the finished vehicle.

Industry stack 01 / 39

The commute and the longer trip

The trips a buyer needs to make
Battery
Vehicle
Charging
Power
Buying and leasing
Trips
Daily and occasional
Charging
Where you need it
Payment
Price or monthly lease
  1. THE INHERITED INDUSTRY

    The commute and the longer trip

    A car has to fit the household budget and work for both the daily commute and a longer drive to see family. Gasoline drivers can use the same network of filling stations for both trips.

    For an electric car, charging takes the place of fuel as the essential complement. Drivers who can plug in at home may cover the commute by charging overnight and still need a public charger on the longer drive. 1

    The trips a buyer needs to make
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Trips
    Daily and occasional
    Charging
    Where you need it
    Payment
    Price or monthly lease
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Daily commuting and occasional longer trips can place different demands on the same car.
    Charging Check where a driver can charge and whether a working, compatible charger is likely to be available.
    Power
    Buying and leasing Buyers have to afford the price or monthly lease payment.
  2. THE INHERITED INDUSTRY Gasoline cars

    Who built, sold and fuelled the car

    Carmakers brought suppliers’ parts together and were accountable for the finished car. Dealers generally sold and serviced it.

    Fuel was an essential complement supplied by a separate network of refiners, distributors and retailers. Drivers of different makes could use the same filling station. 1 2

    The established gasoline-car industry
    A car stopped at a filling station.
    Filling station
    • Vehicle
      CarmakerDealerDriver
    • Refuelling
      Fuel networkDriver
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Parts suppliers served the carmaker, which assembled the vehicle and was accountable for it.
    Charging
    Power
    Buying and leasing Dealers generally handled sales and service. Fuel was supplied through separate refiners, distributors and retailers.

    A gasoline carmaker could sell a car knowing its customers could fill up at stations run by other companies. Plugging in changed that arrangement. Some drivers could charge where they parked. On the road, the public charging network was still being built, and which chargers drivers could use depended in part on the car they bought. 1

  3. THE INHERITED INDUSTRY US passenger cars 2008–2012

    Battery cost was an early constraint

    An electric motor had fewer moving parts than a gasoline engine. From 2008 to 2012, expensive battery packs still made it hard for US carmakers to match the price of a comparable gasoline car. Buyers also had fewer models to choose from and fewer places to charge. 3

    US passenger cars · 2008–2012
    BatteryPack cost
    Vehicle
    ChargingSparse public charging
    Power
    Buying and leasing
    • Affordability
      Expensive packHigher car price
    Layer details
    US passenger cars · 2008–2012
    Layer Development Constraint or change
    Battery Barely started In 2008–2012, pack costs made it hard to match the price of a comparable gasoline car.
    Vehicle Barely started Buyers had few electric models to choose from.
    Charging Barely started Public charging was still limited.
    Power Barely started
    Buying and leasing Barely started

    A cheaper battery could put an electric car within reach. Making a longer trip could still depend on where the driver could recharge.

  4. THE INHERITED INDUSTRY US passenger cars

    Where the driver can charge

    The range on the window sticker came from a test. On a longer drive, the driver needed to know how far the car could go on that route.

    If they needed to stop, they had to find a charger within reach that fit the car and worked when they arrived. 1 3

    Home charging and the longer trip
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    The same car shown between a driveway charger and a public fast charger.
    Home chargingPublic fast charging
    • On the road
      Test rangeYour routeWorking charger
    Layer details
    US passenger cars · 2008–2012
    Layer Development Constraint or change
    Battery Barely started
    Vehicle Barely started Rated range comes from a test. How far a car can drive on a given route is a separate question.
    Charging Barely started A driver needs a working charger compatible with the car where they need to stop.
    Power Barely started
    Buying and leasing Barely started
  5. THE INHERITED INDUSTRY US passenger cars

    Carmakers were accountable for the car

    The Nissan Leaf and Chevrolet Volt showed that electric driving could work. Carmakers still had to make the parts work together and be accountable for the finished car. Tesla took on work that dealers usually did by selling and servicing its cars directly. 2 3

    US passenger cars · Early EVs
    Battery
    VehicleFinished vehicle
    Charging
    Power
    Buying and leasing
    • Tesla
      Direct salesDirect service
    Layer details
    US passenger cars · 2008–2012
    Layer Development Constraint or change
    Battery Barely started
    Vehicle Barely started The carmaker still was accountable for the finished car.
    Charging Barely started
    Power Barely started
    Buying and leasing Barely started Tesla sold and serviced cars through its own outlets.

    Charging brought a similar choice about what the carmaker would do itself.

RESHUFFLE 01 - THE SYSTEM

Charging became a coordination problem

Industry stack 06 / 39

Longer trips needed fast chargers

US premium passenger cars · 2012
Battery
VehicleDaily trips
ChargingLonger routes
Power
Buying and leasing
The same car shown between a driveway charger and a public fast charger.
Home chargingPublic fast charging
  • Longer trip
    Vehicle rangeFast charge on the route
  1. RESHUFFLE 01 - THE SYSTEM US passenger cars 2012

    Longer trips needed fast chargers

    Tesla began delivering the Model S in 2012. To make it practical for drivers who travelled between cities, Tesla needed fast chargers along the roads they drove.

    People without home charging faced a different constraint. They needed somewhere to plug in regularly. 1 4

    US premium passenger cars · 2012
    Battery
    VehicleDaily trips
    ChargingLonger routes
    Power
    Buying and leasing
    The same car shown between a driveway charger and a public fast charger.
    Home chargingPublic fast charging
    • Longer trip
      Vehicle rangeFast charge on the route
    Layer details
    US passenger cars · 2012–2016
    Layer Development Constraint or change
    Battery Getting going
    Vehicle Getting going The Model S could cover many daily trips. Longer trips depended on fast chargers along the route.
    Charging Getting going Fast charging on longer routes and regular charging for drivers without private parking address different needs.
    Power Barely started
    Buying and leasing Getting going
  2. RESHUFFLE 01 - THE SYSTEM US passenger cars

    Public charging took coordination

    Building a charging network took coordination. Property owners and public authorities controlled where drivers could stop. Utilities supplied electricity. Carmakers, retailers and charging companies could install or operate stations.

    Buyers wanted chargers in place before they bought a car. Station operators needed enough electric cars on the road to make the investment worthwhile. 1

    Who could build a charging route
    Battery
    Vehicle
    ChargingStation operation
    PowerElectricity supply
    Buying and leasing
    Electricity
    Utilities
    Site
    Property owners and authorities
    Operation
    Carmakers, retailers and operators
    Layer details
    US passenger cars · 2012–2016
    Layer Development Constraint or change
    Battery Getting going
    Vehicle Getting going
    Charging Getting going Property owners and public authorities controlled sites. A station operator needed drivers to use them.
    Power Barely started Utilities supplied electricity to the sites.
    Buying and leasing Getting going
  3. RESHUFFLE 01 - THE SYSTEM US premium cars 2012–2015

    Tesla ran the network and planned the trip

    Tesla coordinated charging and route planning inside the company. It opened its first six Supercharger sites in 2012. In 2015, its trip planner began routing suitably equipped cars through Superchargers.

    Tesla could guide drivers to the stops it had built, making longer trips easier on the routes it covered. 4

    Tesla · US · 2012–2015
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Tesla
    • Tesla
      In-car trip plannerSupercharger network
    Covered routes
    Easier trips for Tesla drivers
    Layer details
    US passenger cars · 2012–2016
    Layer Development Constraint or change
    Battery Getting going
    Vehicle Getting going The 2015 Trip Planner could route a suitably equipped Model S through Superchargers.
    Charging Getting going Tesla eased long-distance charging for its own drivers on the routes its network covered.
    Power Barely started
    Buying and leasing Getting going
  4. RESHUFFLE 01 - THE SYSTEM US passenger cars 2024

    Ford arranged access to Tesla’s stations

    In 2024, Ford drivers began using adapters to charge at selected Tesla stations. The adapter made the connection fit. An agreement between the two companies gave Ford drivers access. Tesla kept running the stations. 5

    That is the reshuffle. Making the trip possible now meant coordinating the car and the network it used. Carmakers could take on that work themselves or arrange it with another company.

    Ford and Tesla · US · 2024
    Battery
    Vehicle
    Ford
    Charging
    Tesla
    Power
    Buying and leasing
    • Compatible plug
      Ford vehicleAdapterTesla charger
    • Access agreement
      Ford driversSelected Tesla sites
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle The adapter connected the Ford vehicle to the charger. The agreement gave the driver permission to use it.
    Charging Access applied to participating Supercharger sites. Tesla continued to operate them.
    Power
    Buying and leasing
  5. RESHUFFLE 01 - THE SYSTEM US and Norway 2009–2024

    Networks took different shapes

    Other networks came together differently. US government funding backed early deployments. ChargePoint supplied equipment and network services. Tesla built for its own customers.

    Volkswagen’s 2016 emissions settlement led to Electrify America. Seven carmakers announced a shared network in 2023, and Toyota joined IONNA as the eighth in 2024. Who built a charger could depend on a public programme, a settlement, a specialist business or a group of carmakers. 4 6

    Those choices could affect how many cars people bought. A study of Norway from 2010 to 2015 estimated that, at the spending levels studied, a krone spent on public charging subsidies led to more than twice as many additional electric-car purchases as a krone spent on purchase subsidies. At higher spending levels, the model favoured purchase subsidies. 7

    US charging examples · 2009–2024
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Public funding
    EV Project · from 2009
    Specialist
    ChargePoint
    Owned network
    Tesla · 2012
    Settlement
    Electrify America · 2016
    Shared network
    IONNA · 2023–2024
    Norway model · 2010–2015
    Over twice the extra purchases per krone at observed spending
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging Five arrangements appear in the case: government funding, a specialist provider, a carmaker’s own network, a settlement and joint investment.
    Power
    Buying and leasing In the Norwegian model, charger subsidies generated more extra purchases per krone at the spending levels studied. The ranking changed at higher levels.
  6. RESHUFFLE 01 - THE SYSTEM US highway charging 2024–2025

    Drivers needed to know a charger worked

    Drivers also needed to know whether a charger would work when they arrived. From March to August 2024, 32.9% of the fast-charging stations studied along six US interstates shared live status on PlugShare.

    A later model estimated that the electric share of new US light-duty vehicle sales in 2030 could be 6.4 percentage points higher if all highway fast chargers shared live status, the chargers worked more reliably and drivers trusted the information. 8

    US highway fast charging
    Battery
    Vehicle
    ChargingReliability and live status
    Power
    Buying and leasing
    2024 observation
    32.9% shared live status on PlugShare across six sampled interstate routes
    2030 model scenario
    +6.4 percentage points in EV sales share with live data, reliability and driver confidence
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging In 2024, 32.9% of the fast-charging sites studied along six US interstates shared live status on PlugShare.
    Power
    Buying and leasing The later model’s 6.4-percentage-point result for 2030 combines live reporting, uptime and driver confidence.

    Tesla built a charging network. Ford arranged access to one. Inside the car, the choice of what to do yourself and what to get from a partner came up again, this time in vehicle design, software and batteries.

RESHUFFLE 02 - THE ARCHITECTURE

Carmakers kept responsibility for the finished car

Industry stack 12 / 39

Carmakers kept their share of stock-market value

Historical comparison · Through 2005
Battery
Vehicle
Charging
Power
Buying and leasing
Share of industry stock-market value
Carmakers held roughly steady
Share of industry stock-market value
Computer and peripheral makers’ share fell
  1. RESHUFFLE 02 - THE ARCHITECTURE Industry comparison Through 2005

    Carmakers kept their share of stock-market value

    In 1999, Bain predicted that big suppliers would design standard systems for several carmakers and take a larger share of industry profits.

    Computers offered a precedent. In a comparison through 2005, computer and peripheral makers lost a large share of their industry’s stock-market value, while carmakers’ share held roughly steady. Carmakers also kept deciding how the parts would fit together in a finished vehicle. 2 9

    Historical comparison · Through 2005
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Share of industry stock-market value
    Carmakers held roughly steady
    Share of industry stock-market value
    Computer and peripheral makers’ share fell
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Carmakers retained responsibility for how the parts fit and functioned as a whole.
    Charging
    Power
    Buying and leasing The historical comparison tracks stock-market value. The supplier prediction concerned industry profit.
  2. RESHUFFLE 02 - THE ARCHITECTURE US and China

    Tesla and BYD organised pack design differently

    The battery pack became one of those decisions. The pack holds the cells and connects them to the car. Tesla designed packs and bought cells from partners such as Panasonic.

    BYD came from the battery business, bought a carmaker in 2003 and developed batteries and vehicles inside the same company. Both needed the pack to work as part of the car. They organised the work differently. 10

    Two ways to organise pack design
    BatteryCells and pack design
    Vehicle
    Charging
    Power
    Buying and leasing
    • Cell supply
      Panasonic cellsTesla pack design
    • BYD
      Battery designVehicle design
    Layer details
    Layer Development Constraint or change
    Battery Tesla designed packs and sourced cells from partners such as Panasonic. BYD developed batteries and vehicles in the same company.
    Vehicle The pack contains the cells and connects them to the vehicle.
    Charging
    Power
    Buying and leasing
  3. RESHUFFLE 02 - THE ARCHITECTURE Vehicle manufacturing 2022

    Magna built a car for Fisker

    A carmaker could also hire another company to build the car. Fisker hired Magna to help engineer and assemble the Ocean, which went into production in 2022.

    An electric motor simplifies some mechanical work, but the battery, electronics and safety systems still have to work together. US rules require the vehicle manufacturer to certify that the finished car meets safety standards. 11

    Fisker Ocean · Production began 2022
    Battery
    VehicleSafety certification
    Charging
    Power
    Buying and leasing
    • Engineering and assembly
      FiskerMagna
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Magna helped engineer and assemble the Fisker Ocean. US safety certification remained the vehicle manufacturer’s responsibility.
    Charging
    Power
    Buying and leasing
  4. RESHUFFLE 02 - THE ARCHITECTURE US passenger cars 2020

    GM invested in a design for several models

    Carmakers had to decide how much of the vehicle to redesign for electric power. A design built for EVs could serve several models, but it took money up front.

    GM unveiled its Ultium battery system and vehicle platform in 2020 and announced plans to spend $27 billion on electric and autonomous vehicle programmes through 2025. Battery costs still affected what drivers could afford. Charging still affected where they could go. 3 12

    GM Ultium · 2020
    BatteryPack cost
    VehicleDesign investment
    ChargingPublic access
    Power
    Buying and leasing
    GM’s announced spending through 2025
    $27bn across electric and autonomous vehicle programmes
    Layer details
    US passenger cars · 2017–2020
    Layer Development Constraint or change
    Battery Scaling up Battery costs still affected what buyers could afford.
    Vehicle Scaling up A dedicated platform could support several models. GM’s $27 billion plan also covered autonomous vehicle work.
    Charging Scaling up Public charging still affected which routes drivers could take.
    Power Barely started
    Buying and leasing Getting going
  5. RESHUFFLE 02 - THE ARCHITECTURE Vehicle development 2019–2024

    Companies shared vehicle design work

    Some companies shared the design work. In 2019, Ford agreed to use Volkswagen’s electric-vehicle platform for a model in Europe. In 2024, Rivian and Volkswagen formed a joint venture to develop vehicle electrical systems and software.

    That December, battery maker CATL unveiled a chassis with the battery built in and agreed to work on it with AVATR. The companies could reuse an existing design, develop one together or work with a supplier that combined more of the parts. 13

    Shared vehicle designs · 2019 and 2024
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • 2019 · Platform reuse
      VW platformFord in Europe
    • 2024 · Joint development
      RivianVolkswagen
    • 2024 · Battery and chassis development
      CATLAVATR
    Layer details
    Layer Development Constraint or change
    Battery CATL designed the chassis with the battery built in.
    Vehicle Ford agreed to use Volkswagen’s design. Rivian and Volkswagen formed a venture to develop systems. CATL and AVATR agreed to work on an integrated chassis.
    Charging
    Power
    Buying and leasing
  6. RESHUFFLE 02 - THE ARCHITECTURE Vehicle software

    Apple reached drivers through the dashboard

    Software companies found a place inside the car, too. Apple CarPlay let drivers use iPhone apps through the dashboard. Volkswagen brought software teams together inside the company.

    The manufacturer still had to certify the car’s safety and fix defects. Providing an app and changing how the car behaves were different jobs. 14

    Apps and safety in the same car
    Battery
    VehicleSafety and recalls
    Charging
    Power
    Buying and leasing
    • Dashboard access
      Apple CarPlayiPhone apps in the car
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Apple provided dashboard access to apps. The vehicle manufacturer still had to certify safety and fix defects.
    Charging
    Power
    Buying and leasing
  7. RESHUFFLE 02 - THE ARCHITECTURE US vehicle safety 2022

    Tesla fixed a safety defect with software

    In 2022, Tesla recalled a feature that let some cars roll through stop signs under certain conditions. It disabled the feature with a wireless update.

    Carmakers could now change vehicles already on the road. Keeping those vehicles safe remained part of the job after the sale. 15

    Tesla safety recall · 2022
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • After sale
      Rolling-stop recallWireless fix
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Tesla disabled the recalled feature with a wireless update on cars already in service.
    Charging
    Power
    Buying and leasing

    A carmaker could have a design ready and still need the right cells in time to build it.

RESHUFFLE 03 - THE SUPPLY BASE

The battery constraint returned in a different form

Industry stack 19 / 39

Qualified cells and module assembly held up production

US battery supply · 2021–2023
BatteryProduction constraint
Vehicle
Charging
Power
Buying and leasing
  • The battery returns
    Pack costSuitable cells and module assembly
Tesla
Qualified cells
GM
Module assembly
  1. RESHUFFLE 03 - THE SUPPLY BASE US vehicle production 2021–2023

    Qualified cells and module assembly held up production

    Early on, costly packs made electric cars expensive to buy. As carmakers planned to build more vehicles, they needed enough of the right cells and enough capacity to turn those cells into packs.

    In 2021, Tesla reported depending on a small number of qualified cell suppliers. In 2023, GM said difficulty assembling cells into modules held back production of its Ultium vehicles. Tesla needed cells it could use. GM needed to get more out of the next step on the production line. 16

    US battery supply · 2021–2023
    BatteryProduction constraint
    Vehicle
    Charging
    Power
    Buying and leasing
    • The battery returns
      Pack costSuitable cells and module assembly
    Tesla
    Qualified cells
    GM
    Module assembly
    Layer details
    Layer Development Constraint or change
    Battery Tesla depended on qualified cell suppliers. GM reported a bottleneck assembling cells into modules.
    Vehicle Module assembly held back Ultium vehicle production in 2023.
    Charging
    Power
    Buying and leasing

    Lower pack costs could ease the price constraint. Securing enough of the right cells took a different kind of commitment from carmakers.

  2. RESHUFFLE 03 - THE SUPPLY BASE US vehicle production 2022–2023

    Ford committed to future battery supply

    Carmakers began making longer commitments. Ford and South Korea’s SK On formed BlueOval SK in 2022 to make cells for Ford. Ford also agreed to buy minimum quantities of certain materials when suppliers met conditions such as quality or output.

    Those deals helped secure supply. They could also cost Ford money if it needed less than planned. Ford reported about $310 million in volume-related battery obligations in its Model e business in 2023. 17

    Ford battery commitments · 2022–2023
    BatterySupply commitments
    Vehicle
    Charging
    Power
    Buying and leasing
    • BlueOval SK joint venture
      FordSK On
    • Minimum purchases
      Materials suppliersFord carries volume risk
    Layer details
    Layer Development Constraint or change
    Battery Ford and SK On set up a venture to make cells. Ford’s minimum-purchase agreements for certain materials could leave it paying for volumes it no longer needed.
    Vehicle
    Charging
    Power
    Buying and leasing
  3. RESHUFFLE 03 - THE SUPPLY BASE Global battery supply 2024

    CATL made money supplying batteries

    A battery supplier could grow into a large, profitable business in its own right. In 2024, CATL reported 362.0 billion yuan in revenue and 50.7 billion yuan in net profit attributable to shareholders. Its electric-vehicle battery business earned a gross margin of 23.9%.

    Industry data in its prospectus put CATL at 37.9% of global EV battery usage, measured by how much energy the batteries could store. The carmakers that bought cells or packs still had to make them work in the vehicle and be accountable for the car. 18

    CATL · Global results · 2024
    Battery
    VehicleFinished vehicle and warranty
    Charging
    Power
    Buying and leasing
    Net profit
    CNY 50.7bn
    EV battery gross margin
    23.9%
    Global EV battery usage by energy
    37.9%
    Layer details
    Layer Development Constraint or change
    Battery CATL’s share of global EV battery usage measures the energy capacity of those batteries in gigawatt-hours.
    Vehicle A supplier could earn significant profit while carmakers kept responsibility for the finished vehicles.
    Charging
    Power
    Buying and leasing
  4. RESHUFFLE 03 - THE SUPPLY BASE China passenger cars 2016–2019

    Battery sourcing could affect the buyer’s price

    China’s earlier experience showed another reason to change battery suppliers. A carmaker could have a battery that worked well in its vehicle and still need a different supplier for its customers to qualify for a subsidy. 19

    China passenger cars · 2016–2019
    BatterySupplier approval
    Vehicle
    Charging
    Power
    Buying and leasingPurchase subsidy
    • Subsidy eligibility
      Approved battery supplierBuyer’s subsidy
    Layer details
    Layer Development Constraint or change
    Battery China’s national purchase subsidy required a battery from an approved supplier in 2016–2019.
    Vehicle
    Charging
    Power
    Buying and leasing Battery sourcing could affect the price the buyer paid after subsidy.

    Getting enough of the right cells could hold up production. In China, who supplied those cells could also affect what a buyer paid. In the US leasing and depot cases, the decision sat elsewhere again.

RESHUFFLE 04 - THE RULES

China used purchase subsidies to shape battery sourcing

Industry stack 23 / 39

China set a list of approved suppliers

China · January 2016 to June 2019
BatteryApproved supplier
Vehicle
Charging
Power
Buying and leasing
  • Ministry sets the list
    Industry ministryBattery supplierPurchase subsidy
  1. RESHUFFLE 04 - THE RULES China passenger cars January 2016–June 2019

    China set a list of approved suppliers

    From January 2016 to June 2019, an electric-car model in China had to use batteries from a government-approved supplier to qualify for national purchase subsidies. Every supplier on the list was Chinese.

    A policy that changed the price a buyer could pay also changed a decision the carmaker made before the car was built. 19

    China · January 2016 to June 2019
    BatteryApproved supplier
    Vehicle
    Charging
    Power
    Buying and leasing
    • Ministry sets the list
      Industry ministryBattery supplierPurchase subsidy
    Layer details
    Layer Development Constraint or change
    Battery Every approved supplier was a Chinese firm.
    Vehicle
    Charging
    Power
    Buying and leasing The list governed eligibility for national purchase subsidies from January 2016 to June 2019.
  2. RESHUFFLE 04 - THE RULES China passenger cars 2016–2019

    More models used Chinese batteries

    In 2016, fewer than 70% of the electric-car models sold in China used batteries from Chinese suppliers. By 2019, nearly 90% did. The industry ministry could change the list. Carmakers could change suppliers. The share fell after the ministry withdrew the list in June 2019. 19

    China’s 2026–2027 purchase-tax relief uses technical requirements and a list of qualifying models. 20

    China · Supplier sourcing
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Models using Chinese batteries · 2016 to 2019
    Below 70% → nearly 90%
    June 2019
    Ministry withdraws the list
    Separate 2026–2027 rule
    Technical criteria and qualifying models
    Layer details
    Layer Development Constraint or change
    Battery The share of models sold in China using Chinese suppliers’ batteries fell after the ministry withdrew the list.
    Vehicle
    Charging
    Power
    Buying and leasing The separate 2026–2027 purchase-tax relief uses technical criteria and a catalogue of eligible models.
  3. RESHUFFLE 04 - THE RULES China and US passenger cars

    Subsidies can change different decisions

    A purchase subsidy can make a car cheaper for a driver. China also used it to influence who supplied the battery. 19

    In the United States, a separate credit worked through the leasing company. The company could claim the credit and pass savings on to the driver through a lower payment. 21

    Where a policy acts
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • Purchase incentive
      Public creditPurchase price
    • China · 2016–2019
      Supplier eligibilityBattery sourcing
    • US · From 2023
      Lessor creditMonthly payment
    Layer details
    Layer Development Constraint or change
    Battery China’s supplier rule tied the purchase subsidy to the carmaker’s choice of battery supplier.
    Vehicle
    Charging
    Power
    Buying and leasing Purchase support changes the buyer’s price. A credit claimed by a lessor could lower the monthly payment.
  4. RESHUFFLE 04 - THE RULES China passenger cars 2001–2019

    China funded battery, motor and control research

    China had started building up the technology years earlier. In 2001, it began funding research on batteries, motors and the systems that control them. Fifteen years later, the supplier rule gave carmakers a reason to place orders with the battery companies China had approved. 22 19

    China · Research and sourcing policy
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    2001
    Research funding for batteries, motors and controls
    2016
    Supplier rule begins
    2019
    Supplier rule ends
    Layer details
    Layer Development Constraint or change
    Battery Battery research was one priority of China’s national programme starting in 2001.
    Vehicle The programme also funded motors and the systems that control them.
    Charging
    Power
    Buying and leasing
  5. RESHUFFLE 04 - THE RULES China passenger cars 2025

    Drivers could charge at home, in shared parking or in public

    Where people charged mattered in China, too. In a 2025 survey of drivers of fully electric cars, 52% said they used their own home charger and 33% used one shared among residents.

    By the end of that year, China also had more than 4.7 million public charging points. Drivers could get power at home, through shared parking or through a public network. 23

    China · Charging in 2025
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Private home · Driver survey
    52%
    Shared residential · Driver survey
    33%
    Public · National count
    Over 4.7m points
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging The 52% home and 33% shared-residential figures describe battery-electric drivers surveyed. The 4.7 million figure is a national count of public charging points.
    Power
    Buying and leasing

    China used a subsidy to steer orders to battery suppliers. A US credit changed what leasing companies could offer drivers.

RESHUFFLE 05 - THE TRANSACTION

US buyers and lessors faced a different deal

Industry stack 28 / 39

US battery-electric sales fell after the credits ended

US passenger cars · 2025–2026
Battery
Vehicle
Charging
Power
Buying and leasingPurchase and lease terms
30 September 2025
Federal vehicle credit cutoff
Q4 2025 · New battery-electric sales
36% below Q4 2024
  1. RESHUFFLE 05 - THE TRANSACTION US passenger cars 2025–2026

    US battery-electric sales fell after the credits ended

    In the autumn of 2025, the terms of buying an electric car in the United States changed. Some buyers moved their purchases forward before federal vehicle credits ended.

    Sales of new battery-electric vehicles then fell 36% in the fourth quarter compared with the same quarter a year earlier. Sales fell 2% for 2025 as a whole. In the third quarter of 2026, sales rose 6.1% from the previous quarter and remained below their level a year earlier. 24 21

    US passenger cars · 2025–2026
    Battery
    Vehicle
    Charging
    Power
    Buying and leasingPurchase and lease terms
    30 September 2025
    Federal vehicle credit cutoff
    Q4 2025 · New battery-electric sales
    36% below Q4 2024
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing Fourth-quarter 2025 US battery-electric sales were 36% below a year earlier. Full-year sales fell 2%.
  2. RESHUFFLE 05 - THE TRANSACTION US vehicle leasing 2022–2026

    Lower resale values changed lease payments

    Resale values changed what leasing companies could offer. A lessor sets the monthly payment partly on what it expects the car to sell for when the lease ends. CDK Global says leases written in 2022 and 2023 assumed EVs would retain about half their original price. It put market values closer to 35% to 40%.

    The lessor bears the shortfall if a returned car sells for less than expected. A lower resale estimate also raises the payment on a new lease if the other terms stay the same. In January 2026, CDK cited projections of 123,000 US EV lease returns for 2025 and more than 300,000 for 2026. 25

    US · Leases written in 2022 and 2023
    Battery
    Vehicle
    Charging
    Power
    Buying and leasingResale and lease payments
    • At the end of a lease
      DriverLessorUsed market
    Expected resale value
    About 50%
    Estimated market value
    35–40%
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing A lower expected resale value raises the payment on a new lease if the other terms stay the same. On a returned car, the lessor bears a shortfall against its estimate.

    Resale values shaped one part of the payment. Federal credits could also bring it down.

  3. RESHUFFLE 05 - THE TRANSACTION US vehicle leasing 2023–2025

    Lessors could pass the credit on to drivers

    Federal policy had helped make leasing attractive. From January 2023, a lessor could claim a credit on a qualifying EV and pass savings on to the driver. The rules let lessors offer savings on some models that missed the purchase credit’s assembly or battery-sourcing requirements. More than half of new EV transactions in Experian’s fourth-quarter 2024 data were leases.

    Federal new, used and commercial vehicle credits ended for vehicles acquired after 30 September 2025. Qualifying charging equipment had a separate deadline of 30 June 2026 to be put into service. 21

    US clean-vehicle credits · 2023–2026
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • Commercial vehicle credit
      Federal creditLessorMonthly payment
    Vehicle acquisition cutoff
    30 September 2025
    Charging equipment deadline
    30 June 2026
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging The separate deadline to put qualifying charging equipment into service was 30 June 2026.
    Power
    Buying and leasing The acquisition deadline for the new, used and commercial clean vehicle credits was 30 September 2025.
  4. RESHUFFLE 05 - THE TRANSACTION Global Model e 2023–2025

    Ford’s EV segment reported losses

    Carmakers were managing costs of their own. Ford reported losses before interest and taxes of $4.8 billion in 2023, $5.1 billion in 2024 and $4.8 billion in 2025 for Model e.

    The segment covers Ford’s EV business across North America, Europe and China and includes software and connected-vehicle work for the wider company. Ford reports leasing and financing separately in Ford Credit. 26

    Ford Model e · Global segment
    Battery
    Vehicle
    Charging
    Power
    Buying and leasingFord Credit is separate
    2023 · EBIT
    −$4.8bn
    2024 · EBIT
    −$5.1bn
    2025 · EBIT
    −$4.8bn
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle Model e includes software and connected-vehicle work across the wider company.
    Charging
    Power
    Buying and leasing Ford reports its leasing and financing in Ford Credit.

    For delivery fleets, the constraint could arise after the purchase. Getting enough power at the depot could determine when the truck went to work.

RESHUFFLE 06 - THE POWER SYSTEM

Delivery fleets needed enough power at one site

Industry stack 32 / 39

Trucks returned to charge at one site

US delivery fleets · 2025
Battery
VehicleKnown routes
Charging
PowerOne depot
Buying and leasing
Delivery trucks at charging bays in one depot.
Depot charging
  • End of shift
    Several routesOne depotTrucks charge together
  1. RESHUFFLE 06 - THE POWER SYSTEM US depot fleets 2025

    Trucks returned to charge at one site

    A delivery fleet can choose trucks for known routes and bring them back to the same depot. US sales of electric medium and heavy freight trucks rose 25% to about 17,000 in 2025. More than 95% were medium freight trucks, a category that includes some delivery vans.

    When those vehicles return to charge at the same time, the fleet needs a lot of electricity in one place. 27

    US delivery fleets · 2025
    Battery
    VehicleKnown routes
    Charging
    PowerOne depot
    Buying and leasing
    Delivery trucks at charging bays in one depot.
    Depot charging
    • End of shift
      Several routesOne depotTrucks charge together
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle A fleet can pick trucks for known routes.
    Charging Trucks return to the same depot and may charge at the same time.
    Power Demand for electricity concentrates at the depot when several trucks plug in together.
    Buying and leasing
  2. RESHUFFLE 06 - THE POWER SYSTEM North American depot fleets 2023–2024

    Depots waited for utility power

    At ten North American depots studied in 2023, getting power to the chargers took nine to 36 months. A fleet could have trucks ready for their routes and still be waiting for enough power to start using them.

    In 2024, California’s utility regulator set connection timelines for its three large investor-owned utilities. In that decision, it declined to give transportation projects priority over other customers. 28

    North American depot study · 2023
    Battery
    Vehicle
    Charging
    PowerDepot connection
    Buying and leasing
    Time to get power · 10 depots studied
    9–36 months
    California · 2024
    Regulator sets connection timelines
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power At ten North American sites studied, getting power to the chargers took nine to 36 months.
    Buying and leasing
  3. RESHUFFLE 06 - THE POWER SYSTEM Southern California depot May 2024

    One depot supplied its own power

    One fleet found another way to get power. In May 2024, Prologis and Maersk’s Performance Team opened the Denker depot in Southern California. On-site gas generators and batteries gave the depot up to 9 megawatts of charging capacity while it waited for a utility upgrade. 29

    Denker depot · California · May 2024
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • Up to 9 MW
      On-site gas generators and batteriesDepot chargers
    Utility upgrade
    Pending when the depot opened
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power At Denker, gas generation and batteries provided up to 9 MW of charging capacity while a utility upgrade was pending.
    Buying and leasing
  4. RESHUFFLE 06 - THE POWER SYSTEM Fresno depot December 2024

    Fresno charged when the grid had room

    At its Fresno depot, PepsiCo coordinated with PG&E to draw extra power when the local grid could handle it. PG&E says the additional power was available from December 2024, 18 months ahead of the scheduled upgrade.

    PepsiCo could charge about 50 trucks, up from about 30, by staying within a power limit that changed with conditions on the grid. 30

    PepsiCo depot · Fresno · December 2024
    Battery
    Vehicle
    Charging
    PowerFlexible power limit
    Buying and leasing
    • More power when the grid can handle it
      PG&EPepsiCo depot
    Trucks that could charge
    About 30 → 50
    Additional power available
    18 months ahead of upgrade schedule
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging The flexible limit allowed PepsiCo to charge about 50 trucks, up from about 30.
    Power The extra power depended on grid conditions. It was available 18 months ahead of the scheduled upgrade.
    Buying and leasing

    At Fresno, the decision sat with the utility and the fleet. In the passenger-car cases, different actors could ease the constraints on buying or leasing a car.

CLOSING

Three cases, three decisions

Industry stack 36 / 39

The ministry could change the supplier rule

China passenger cars · 2016–2019
Battery
Vehicle
Charging
Power
Buying and leasing
  • Who could act
    Ministry sets listCarmaker chooses supplier
  1. CLOSING China passenger cars 2016–2019

    The ministry could change the supplier rule

    The battery supplier could determine whether buyers qualified for a purchase subsidy. The industry ministry set the list. Carmakers could switch suppliers to meet the rule. 19

    China passenger cars · 2016–2019
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • Who could act
      Ministry sets listCarmaker chooses supplier
    Layer details
    Layer Development Constraint or change
    Battery The industry ministry set the list. Carmakers could switch suppliers to qualify.
    Vehicle
    Charging
    Power
    Buying and leasing From 2016 to 2019, battery sourcing affected eligibility for China’s national purchase subsidy.
  2. CLOSING North American depots 2023–2024

    Utilities and fleets could get power to depots

    The power connection could determine when trucks started work. Utilities connected sites, regulators set the terms, and some fleets found ways to get power sooner. 28 29 30

    North American depots · 2023–2024
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    • Who could act
      Utility connects siteFleet can arrange power on site
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power Utilities connected sites, regulators set the terms, and some fleets arranged other sources of power.
    Buying and leasing
  3. CLOSING US passenger cars 2025

    Carmakers and lessors could change the deal

    The price and monthly payment could determine whether a buyer went ahead. Carmakers could adjust prices, lessors could change lease terms, and Congress could change the credits. 24 25 21

    US passenger cars · 2025
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing
    Carmaker
    Vehicle price
    Lessor
    Monthly payment
    Congress
    Vehicle credits
    Layer details
    Layer Development Constraint or change
    Battery
    Vehicle
    Charging
    Power
    Buying and leasing Carmakers could adjust prices, lessors could set lease terms and Congress could change credits.
  4. CLOSING

    Profit, control and risk sat in different places

    Where the constraint sits shapes who can act. A carmaker can take on work itself, share it with a partner or plan around decisions another organisation makes. Those choices shape who earns money and who carries risk.

    CATL could earn substantial profits supplying batteries while the carmaker still had to be accountable for the finished vehicle. The industry had changed around the car, and the carmaker still had to put it all together. 2 18

    Three cases, three decisions
    • China passenger cars, 2016–2019

      Battery sourcing for purchase subsidy eligibility

      The ministry set the list. Carmakers could switch suppliers.

    • North American depots, 2023–2024

      Enough power to charge at the depot

      Utilities connected sites. Regulators set the terms. Fleets could arrange another source of power.

    • US passenger cars, 2025

      Purchase prices, lease payments and federal credits

      Carmakers could adjust prices. Lessors could set lease terms. Congress set the credits.

    Layer details
    Layer Development Constraint or change
    Battery In China, choosing a supplier could affect purchase-subsidy eligibility.
    Vehicle
    Charging
    Power At North American depots, the power connection could set the start date.
    Buying and leasing In the US passenger case, purchase prices, lease terms and credits affected the deal.

We began with a filling station that could serve drivers across brands. With electric cars, Tesla built its own charging network and Ford arranged access to selected Tesla stations. Inside the car, specialists could supply batteries and software. The carmaker still had to make the parts work together and be accountable for the finished vehicle.

The three cases show how far the change reached. In China, a ministry’s supplier list helped determine which cars qualified for a subsidy. In the US, a lessor could change the monthly payment. At a depot, the fleet and utility could work out when the trucks had enough power to charge. As the constraint changed, so did who could get the next vehicle onto the road.

Sources and notes

What this story covers

The story follows developments from 2008 to 2026 in US passenger cars, Chinese passenger cars and North American depot fleets. Early US premium cars provide a secondary comparison.

  • US passenger Daily passenger travel Principal case
  • US premium Daily passenger travel for premium buyers Secondary comparison
  • China passenger Daily passenger travel Principal case
  • Depot fleets Scheduled delivery and freight routes Principal case

Six changes across three markets.

References and supporting detail

  1. Charging as a complement

    Edward G. Anderson, Hemant K. Bhargava, Jonas Boehm and Geoffrey Parker, “Electric Vehicles Are a Platform Business: What Firms Need to Know,” California Management Review 64(4), 135–154, 2022. The authors explain how a mature fuel network served gasoline drivers, how home charging changes the role of public stations, and why drivers and station operators can each wait for the other to invest.

    Anderson, Bhargava, Boehm and Parker, 2022

  2. Who built, sold and fuelled the car

    Jacobides, MacDuffie and Tae trace carmakers’ control over vehicle integration. The US Energy Information Administration documents the fuel supply chain. Tesla’s 2012 annual filing describes its own sales and service network.

    Jacobides, MacDuffie and Tae, Strategic Management Journal · EPA gasoline distribution analysis, section 2.1.2 · Tesla 2012 Form 10-K, Item 1

  3. Early cars, battery costs and range

    Nykvist and Nilsson track battery-pack prices. The National Research Council explains how price, range, model availability and charging affected early adoption. The US Department of Energy dates the Leaf and Volt market launches.

    Nykvist and Nilsson, Nature Climate Change, Figure 1 · National Research Council, Overcoming Barriers to Deployment of Plug-in Electric Vehicles, summary and Table S-2 · US Department of Energy, 2010 market launches

  4. Tesla’s network and trip planner

    Tesla announced six Supercharger sites in 2012. Its 2015 Model S release notes describe Trip Planner routing via Superchargers on suitably equipped cars.

    Tesla’s 2012 launch · Tesla Model S 2015 release notes, p. 2

  5. Ford’s charging access

    Tesla published its connector design in 2022. SAE issued its first J3400 document in 2023 and revised it in 2024. Ford’s rollout describes access to participating Supercharger sites with an adapter.

    US Joint Office connector timeline · SAE J3400 · Ford Q1 2024 results, adapter rollout

  6. How charging networks were built

    The early EV Project drew on US government funding. ChargePoint sold equipment and services. Tesla built its own network. Volkswagen’s settlement led to Electrify America. Seven carmakers announced a joint network in 2023, and Toyota joined IONNA in 2024.

    Idaho National Laboratory · ChargePoint FY2023 filing · EPA settlement · IONNA’s founding announcement · Toyota’s entry

  7. Norwegian charger and purchase subsidies

    Katalin Springel models additional electric-car purchases attributable to charger subsidies and purchase subsidies in Norway from 2010 to 2015. The comparison changes with the level of spending.

    Springel, American Economic Journal: Economic Policy

  8. Charger reliability and live status

    In the July 2024 snapshot, none of the sampled Tesla or Electrify America sites shared live status on PlugShare. The January 2025 model estimated increases of 1.1 percentage points with live reporting alone, 2.7 with improved uptime and 8.0 with greater driver confidence as well. The September model used a revised policy baseline for the 6.4-point scenario.

    Asensio et al., NBER working paper, Table 1 and §5.3 · Asensio et al., AEI–Brookings, pp. 11–13 and Figure 5

  9. The supplier prediction and market value

    Bain’s prediction concerned profit share. Jacobides and MacDuffie’s historical exhibit measures stock-market value. The authors’ separate study with Tae traces carmakers’ authority over vehicle integration.

    Jacobides and MacDuffie, original market-capitalisation comparison · Jacobides, MacDuffie and Tae, Strategic Management Journal

  10. Pack design and sourcing

    Tesla’s agreement with Panasonic covered capacity and purchase volumes. BYD entered carmaking by acquiring Xi’an Tsinchuan Auto in 2003.

    MacDuffie, Jacobides and Tae, working paper, §4.1 · Argonne National Laboratory, battery supply chain · Tesla’s 2020 Panasonic agreement · BYD company history

  11. Contract assembly and certification

    Fisker and Magna report the Ocean’s engineering and production arrangements. The US certification rule assigns safety certification to the vehicle manufacturer.

    Fisker FY2023 Form 10-K · Magna 2024 annual filing · US vehicle certification rule · Vehicle architecture study, Industrial and Corporate Change

  12. Platform investment

    GM announced planned spending of $27 billion across electric and autonomous programmes through 2025. Carmakers could adapt an existing design or build a dedicated platform for multiple models.

    GM’s 2020 investment announcement · BloombergNEF 2020 battery price survey

  13. Shared vehicle designs

    Ford reused Volkswagen’s vehicle platform. Rivian and Volkswagen agreed to develop electrical systems and software together. CATL and AVATR signed a development agreement for a chassis with the battery built in.

    Ford’s 2019 MEB agreement · Rivian FY2024 Form 10-K, joint venture disclosure · CATL Bedrock launch

  14. Software and the dashboard

    Apple provided in-car access to iPhone apps. Volkswagen consolidated software teams in-house. Tesla’s 2024 annual filing groups driving features, connectivity, free Supercharging and wireless updates in deferred automotive revenue and reports paid Supercharging in services and other revenue.

    Apple’s CarPlay launch · US certification requirements · US recall responsibilities · Volkswagen 2020 annual report · Tesla 2024 annual filing, Note 2

  15. Software changes after the sale

    The rolling-stop recall shows a wireless safety fix. Tesla also used firmware to change battery management on some vehicles.

    NHTSA recall report and remedy · NHTSA battery-management investigation

  16. Cells and modules

    Tesla identified its dependence on qualified cell suppliers. GM identified module assembly as a limit on Ultium production. The IEA reports capacity and demand at global scale.

    Tesla FY2021 Form 10-K, Item 1A · GM’s November 2023 shareholder letter · IEA, battery capacity and demand

  17. Battery supply commitments

    Carmakers secured future supplies through minimum purchases, advance payments, equity stakes and joint production. GM paid Livent $198 million in advance in 2022 and made an initial $320 million equity investment in Lithium Americas in 2023 alongside a supply agreement. Ford and SK On split their venture in May 2026. Ford took the Kentucky plants and SK On took the Tennessee operation.

    Ford FY2023 Form 10-K, Items 1A and 7 · Ford June 2026 Form 10-Q, Note 16 · Livent 2022 annual filing · Lithium Americas first investment closing

  18. CATL and battery capacity

    CATL’s revenue and net profit are audited FY2024 figures. The industry data in its prospectus measures EV battery usage in gigawatt-hours. The IEA estimates that China held more than 80% of global lithium-ion battery manufacturing capacity in 2025.

    CATL FY2024 annual report · CATL listing prospectus, industry and financial sections · MacDuffie, Jacobides and Tae, section 4.1 · IEA battery manufacturing and trade

  19. China’s supplier list

    Barwick and co-authors trace sourcing changes during the subsidy rule and after its withdrawal. Their comparison counts models sold in China. The industry ministry withdrew the list in June 2019.

    Barwick et al., Drive Down the Cost, §2 and Figure A4 · MIIT June 2019 repeal notice

  20. China’s 2026–2027 purchase-tax relief

    The policy uses technical criteria and a catalogue of qualifying vehicle models.

    China’s 2026–2027 technical criteria notice

  21. US leasing and federal vehicle credits

    The commercial credit and purchase credit had different eligibility rules. Experian’s fourth-quarter 2024 data supplies the leasing share. Public Law 119-21 and IRS guidance give the separate vehicle acquisition and charging-equipment deadlines.

    Allcott et al., NBER working paper 33032, §5.3 and Figure 5 · Experian Q4 2024 auto finance report · Public Law 119-21, §§70501–70504 · IRS cutoff and acquisition guidance

  22. Early Chinese EV research

    The national 863 Programme included research on batteries, motors and controls starting in 2001.

    ICCT historical review, pp. 2–3

  23. Charging in China

    Roland Berger’s survey percentages describe respondents who drive battery-electric vehicles in China. The IEA reports a national count of public charging points.

    Roland Berger, EV Charging Index 2025, Figure J · IEA, 2025 public charger deployment

  24. US vehicle sales

    Cox reports battery-electric sales. The US Energy Information Administration reports that conventional hybrids gained market share in 2025 while battery-electric and plug-in hybrid vehicles lost share.

    Kelley Blue Book/Cox Automotive, Q4 and full-year 2025 · Cox September 2025 monitor · Cox Q3 2026 report · EIA US vehicle sales mix

  25. Lease returns and the used market

    CDK’s January 2026 analysis supplies both projections and the resale estimates. Cox estimated 37.4 million US used-vehicle sales in 2024, compared with about 16 million new vehicles.

    CDK Global, January 2026 dealer analysis · Ford FY2025 Form 10-K, critical accounting estimates and operating leases · Cox used-vehicle sales · Cox new-vehicle sales

  26. Ford Model e and Ford Credit

    Ford’s 2025 filing reports a comparable Model e series and recasts the 2023 segment loss at $4.778 billion. It reports Ford Credit separately.

    Ford FY2025 Form 10-K, Item 7 and segment reporting

  27. Electric freight trucks

    The IEA’s revised series includes heavier delivery vans. RMI explains how charging several trucks at the same time concentrates power demand at a depot.

    IEA, Global EV Outlook 2026, electric truck sales and definitions · RMI, depot charging loads

  28. Connecting depots to power

    The nine-to-36-month range comes from the ten participating depots. Major substation construction is a separate planning lead time and can take five years or more.

    NACFE ten-depot study · CPUC energisation decision summary · CPUC 2024 decision, §7.3 · ACEEE on substation lead times

  29. Denker’s on-site power

    Prologis and Performance Team describe the on-site generation and storage that let the depot open while it waited for a utility upgrade.

    Prologis and Performance Team project announcement

  30. Fresno and grid connections

    PG&E reports the earlier start and increase in trucks served. Connecting a depot to local distribution, connecting a large load to transmission and connecting generation or storage each involve different processes.

    RMI, Getting Electric Truck Chargers Online Faster · PG&E’s Fresno case · CPUC distribution connections · CAISO large-load connections · Berkeley Lab generation and storage queues